Project Details
The scope of work for construction consists of the replacement of approximately 6,050 lineal feet of end-of-lifecycle 6-inch and 8-inch asbestos cement (AC) water main with new 4-inch and 8-inch ductile iron (DI) water main, replacement of fire hydrants, valves, water service lines, asphalt concrete patching and overlay, driveway repair, and surface restoration.
Project Benefits
- Fewer leaks and breaks
- Enhanced water quality
- Better fire protection flow
- Reduced maintenance costs
- Lower risk of water service interruptions
Schedule
The District's Contractor, Fury Site Works, will begin construction in June 2025, wrapping up in December 2025.
What to Expect During Construction
- Equipment noise
- Construction traffic
- Street detours with local access
- Driveway and pedestrian access restrictions
- Temporary water service interruptions during construction
Questions? Contact the District Office at 253-630-9900 or customer_service@sooscreek.com