- Home
- Development
- Design Criteria
Design Criteria
- Design and Construction Standards (PDF)
- Sewer Design Criteria (PDF)
- Side Sewer Standards (PDF)
- Water Design Criteria (PDF)
- Water/Sewer Design Blocks (PDF)
- Sample Graphics Standards, Residential Sewer (PDF)
- Sample Graphics Standards, Residential Water (PDF)
- Sewer Title Block dwg
- Water Title Block dwg
Standard Specs & Details - Water
- Detail W-1A Concrete Blocking
- Detail W-1B Minimum Bearing Area
- Detail W-1C Restrained Pipe Length.pdf
- Detail W-2 Roadway Section for Residential.pdf
- Detail W-3 Typical Roadway Section.pdf
- Detail W-4 Fire Hydrant Rolled Curb.pdf
- Detail W-5 Fire Hydrant Vertical Curb.pdf
- Detail W-6 Fire Hydrant Commercial.pdf
- Detail W-7 Fire Hydrant Gravel Shoulder.pdf
- Detail W-8 Blowoff Assembly In Paving.pdf
- Detail W-9 Blowoff Assembly Off Paving.pdf
- Detail W-10 Blowoff Assembly.pdf
- Detail W-10A Blowoff Assembly.pdf
- Detail W-11 Blowoff Assembly.pdf
- Detail W-11A Blowoff Assembly.pdf
- Detail W-12 AC Water Main Replacement.pdf
- Detail W-13 Valve Box Protection and Marker.pdf
- Detail W-14 Valve Opening Nut Extension.pdf
- Detail W-15 Water Service Connection.pdf
- Detail W-16 Meter Setter.pdf
- Detail W-16A New Service Transfer.pdf
- Detail W-17 Temporary Blowoff Assembly.pdf
- Detail W-18 Meter Box and Lid
- Detail W-19 Meter Installation.pdf
- Detail W-20 Water Service Connection.pdf
- Detail W-21 Meter Setter Alternate_08_07_25
- Detail W-22 Meter Setter Alternate_08_07_25
- Detail W-23 Irrigation Meter Setter Alternate_08_07_25
- Detail W-24 Irrigation Meter Setter Alternate_08_07_25
- Detail W-25A Double Check Backflow Assembly.pdf
- Detail W-25B Double Check General Notes.pdf
- Detail W-25C Locking Frame and Cover.pdf
- Detail W-26A Meters.pdf
- Detail W-26B Meters General Notes.pdf
- Detail W-26C Locking Frame and Cover.pdf
- Detail W-27A Turbo Meter.pdf
- Detail W-27B Turbo Meter General Notes.pdf
- Detail W-28 Air Vacuum Valve Chamber.pdf
- Detail W-29 Pipe Anchor Detail.pdf
- Detail W-30 Sack Slope Retainer.pdf
- Detail W-31 Filter Fabric Fence.pdf
- Detail W-32 Utility Water Main Crossing.pdf
- Detail W-33 Typical Trench- Asphalt Areas
- Detail W-34 Typical Trench - Outside Roadway
- Detail W-35A Vertical Redirection of Main.pdf
- Detail W-35B Horizontal Redirection of Main.pdf
- Detail W-36A Pressure Zone Check Valve Vault.pdf
- Detail W-36B Pressure Zone Check Valve General Notes.pdf
- Detail W-36C Pressure Zone Check Valve Manhole.pdf
- Detail W-36D Pressure Zone Check Valve General Notes.pdf
- Detail W-37 RP Backflow Assembly
Standard Specs & Details - Sewer
- Detail S-1 Special Manhole Cut in Installation.pdf
- Detail S-2 Manhole_11_25_25
- Detail S-3 Surface Clean Out.pdf
- Detail S-4 Stub Service Construction
- Detail S-8 Stub Service Manufactured Home.pdf
- Detail S-9 Saddle Stub Service.pdf
- Detail S-11 Pipe Anchor.pdf
- Detail S-15 Filter Fabric Fence.pdf
- Detail S-16 Grinder Pump Service.pdf
- Detail S-17 Grinder Pump FINAL
- Detail S-18 Grinder Double Service FINAL
- Detail S-19A Gravity Sewer Connection.pdf
- Detail S-19B Connection Gravity Stub.pdf
- Detail S-19C Connection Pressure Stub.pdf
- Detail S-19D Connection Construction Requirements.pdf
- Detail S-19E Grinder Materials FINAL
- Detail S-21 Shallow Manhole_11_25_25
- Detail S-22 Grinder Service Tap.pdf
- Detail S-23 Manhole Rim and Cover_11_25_25
- Detail S-25 Drop Manhole.pdf
- Detail S-26 Backwater Valve.pdf
- Detail S-27 Standard Manhole_11_25_25
- Detail S-28 Typical Trench - Asphalt Areas
- Detail S-29 Typical Trench - Outside Roadway
- Detail S-30 Surface Clean Out.pdf
- Detail S-31 Force Main Tracing Wire.pdf
- Detail S-32 Grinder Force Main into Manhole.pdf
- Detail S-33A Dumpster Pad Drain.pdf
- Detail S-33B Dumpster Pad Drain Two Way Cleanout.pdf
- Detail S-34 End Force Maine Cleanout
- Detail S-5 Stub Service Alternate.pdf
- Detail S-6 Stub Service Alternate.pdf